Monday, May 3, 2010

the man cave


I was a bit intimidated by the steep stairs leading up to our attic (aka 'the man cave'.) This morning when I left for work there were no stairs, just a hole in the ceiling from the second bedroom. I get home and there's a staircase. Super cool.

If you ever come to visit and you are allowed entry to the man cave here's a tip. Don't look down.
It's so big up there. I love it. Today I finally feel like it's all coming together and that these months of living in putrid dust and grime will be worth it.


And now for a quick look at where we're up to.

Updated Bedroom 'To Do' List

Have doors installed
Electrician to finish wiring
Gyprocker to do put up walls, cornices and ceiling
Choose wooden floorboards
Have existing floors removed
Have new floorboards layed and polished (rescheduled 10 May)
Choose lights
Have lights attached to wires
Design wardrobe
Order wardrobe
Install wardrobe
Choose skirting boards and architraves
Attach skirting boards and architraves (rescheduled 6 and 7 May)
Paint walls, ceilings, skirting boards, architraves and windows (now 50% done, tbc 8 May)
Wardrobe doors and doorknobs attached (mystery time frame)

No comments:

Post a Comment